Inventory Optimization Project – Irvine Cummins Parts Warehouse

I managed an inventory optimization project using ABC analysis to improve profitability, reduce holding costs, and increase warehouse efficiency. The project targeted slow-moving C and D class inventory, aiming to shift inventory distribution from 61% AB / 39% CD to a new goal of 90% AB / 10% CD.

Situation

In 2024, our C&D class (slow-moving) inventory accounted for 39% of total stock, limiting space for fast-moving AB items. The objective was to reduce C&D to 10% of inventory value and reallocate space to AB products, improving product availability and sales.

Tasks

Actions

  1. Developed an interactive Excel dashboard displaying C&D inventory by units on hand and total cost, with a detailed breakdown for the four most important product categories: Ceco, Onam, FLG, and DRC.
  2. Created a prioritized return list, focusing on products with the lowest sales over the past 12 months, high-cost items, and those occupying significant warehouse space.
  3. Recommended setting target stock levels (TSL) to zero for Class D products, and for Class C products, setting TSL as annual quantity sold ÷ 12 (rounded down) to address overstocking.
  4. Proposed returning 25% of slow-moving inventory each quarter, with the dashboard identifying the products — by units and cost — that meet each quarterly target.
Inventory Optimization Dashboard – Part 1 Inventory Optimization Dashboard – Part 2

Results

Reduced slow-moving inventory from 39% to 22% in just 9 months — an 17% decrease. Freed warehouse space allowed us to stock more AB inventory, improving availability of high-demand products and driving increased sales.

Inventory Optimization Dashboard – Part 3